Building the Playhouse are Hope Ranch continued. We came up with a general design and decided to put concrete on the bottom. It was an interesting experience. You have to prep the concrete area, frame it, put down rock, and then put in the concrete. We did two areas. One in front of the tack shed and then the playhouse area.
Terri and I picked up the concrete in Murray and everyone else helped with the concrete. Next time, I will get more help. The concrete started to cure, so it wasn't the smoothest job ever, but we got the job completed.
No comments:
Post a Comment