Monday, January 9, 2017

November 2016 Parents Remodel

We did alot of days at my mom's house for their remodel. 

11-3-2016
Putting Primer on the ceiling.


Panoramic View of most of the area we had to put primer on for the ceiling.

Logan enjoying graham crackers and milk during one of our breaks.

Kali eating and my mom in the background on the ladder.

Kids (Kasiah, Leili and Kara) playing outside in the leaves.



Leili, Logan, and Kyla


11-12-2016
Helping move dirt and gravel to build the retaining wall Spent two days being the work horse and muscles for this project. I would shovel the dirt and gravel from the front and move the wheelbarrow fulls to the back while mom positioned everything and told me where things went. 


My lovely dirt pile that I moved twice.

 Digging a hole after having buried the sprinkler line to extend the piping and the sprinkler.



11-15-2016
Finally finished it off and took pictures of the retaining area. 





11-16-2016
Logan playing with Papa. 


 New cupboard that had the door on the wrong side.

Kids playing while we prepped cabinets.

Helping my mom unload the cabinets getting ready to refinish them.







11-17-2016
Cleaning the doors and drawers of the cabinets. 







11-21-2016
Morning workout before watching Leili and Kyla for a couple hours so my mom and Kali could stain the cabinets. 


Logan trying to walk around in Matt's shoes. If you notice, he has one on backwards.

Lunch time with four kids.




No comments: